headerdrawing1.jpg (96365 bytes)

Sulphuric Acid on the WebTM Technical Manual DKL Engineering, Inc.

Knowledge for the Sulphuric Acid Industry Line.jpg (1139 bytes)

Sulphuric Acid on the Web

Introduction
General
Equipment Suppliers
Contractor

Instrumentation
Industry News
Maintenance
Acid Traders
Organizations
Fabricators
Conferences

Used Plants
Intellectual Propoerty
Acid Plant Database
Market Information
Library

Technical Manual

Introduction
General

Definitions
Instrumentation
Plant Safety
Metallurgial Processes
Metallurgical
Sulphur Burning
Acid Regeneration
Lead Chamber
Technology
Gas Cleaning
Contact
Strong Acid
Acid Storage
Loading/Unloading

Transportation
Sulphur Systems
Liquid SO2
Boiler Feed Water
Steam Systems

Cooling Water
Effluent Treatment
Utilities
Construction
Maintenance
Inspection
Analytical Procedures
Materials of Construction
Corrosion
Properties
Vendor Data

DKL Engineering, Inc.

Handbook of Sulphuric Acid Manufacturing
Order Form
Preface
Contents
Feedback

Sulphuric Acid Decolourization
Order Form
Preface
Table of Contents

Process Engineering Data Sheets - PEDS
Order Form
Table of Contents

Introduction

Bibliography of Sulphuric Acid Technology
Order Form

Preface
Contents

Sulphuric Acid Plant Specifications
 

Google Search new2.gif (111 bytes)

 

 

Acid Plant Database  May 19, 2015

Owner Empresa Nacional de Mineria – ENAMI

Enami-Logo.jpg (2328 bytes)

Location

Camino Público S/N
Copiapó, Chile

Background -
Website www.enami.cl
Plant

Paipote Smelter – Fundición Hernán Videla Lira

Plant No. 1 Plant No. 2
Coordinates  27° 25' 4" S, 70° 15' 23" W 27° 25' 3" S, 70° 15' 26" W
Type of Plant Metallurgical
Gas Source

Copper
El Teniente Converter
Peirce-Smith Converters (1 Hot, 1 Standby)

Plant Capacity 280 MTPD 560 MTPD
SA/DA SA SA
Status Operating Operating
Year Built 1970 1997
Technology Mechim S.A. Panamerican
Contractor - -
Remarks

-

1972 - Plant originally built for Disputada Chagres by Panamerican Consulting International
1997 - Plant purchased, dismantled, transported and re-erected at Paipote site.

Main blower capacity increased: 65,000 to 110,000 Nm3/h
Cesium catalyst in Bed 1
Radial flow scrubber
New Gas Cooling Tower

Pictures  
General

Smelter Modernization (Completed 2001)

- shutdown reverberatory furnace

- install Teniente Converter
- New acid plant

References Sanhueza, J.A., Rojas, O.C. and Rojas, P.A., Recent Developments at ENAMI's Hernan Videla Lira Smelter, Copper 2003 - Volume IV Pyrometallurgy of Copper, Book 1, pp. 307-323.
News April 6, 2010 - BNamericas reported that Chilean state minerals company Enami will see its Hernán Videla Lira smelting plant's 2010 production reduced by close to 3% as a result of 10 day stoppage at the facility.  Enami said in a filling submitted to securities regulator SVS that the plant, also known as Paipote, stopped operations on March 31st 2010 after a hot gas fan at one of its two sulfuric acid plants failed, something the company was unable to forecast.  The facility, located in northern region III is Chile's oldest smelting plant and Enami's largest, producing close to 350,000 tonne per year of fire refined copper in the form of anodes to be converted into cathodes at state copper producer Codelco's Ventanas refinery in central region V. The site also produces close to 290,000 tonnes per year of sulfuric acid at the 2 plants, which treat sulfur gases coming from the smelting process.

MTPD - Metric Tonne per Day           STPD - Short Ton per Day
MTPA - Metric Tonne per Annum      STPA - Short Ton per Annum
SA - Single Absorption
DA - Double Absorption
 

* Coordinates can be used to locate plant on Google Earth