Knowledge for the Sulphuric Acid Industry
Sulphuric Acid on the Web
Introduction
General
Equipment Suppliers
Contractor
Instrumentation
Industry News
Maintenance
Acid
Traders
Organizations
Fabricators
Conferences
Used
Plants
Intellectual
Propoerty
Acid
Plant Database
Market
Information
Library
Technical Manual
Introduction
General
Definitions
Instrumentation
Plant Safety
Metallurgial
Processes
Metallurgical
Sulphur Burning
Acid Regeneration
Lead Chamber
Technology
Gas Cleaning
Contact
Strong Acid
Acid Storage
Loading/Unloading
Transportation
Sulphur
Systems
Liquid SO2
Boiler Feed Water
Steam Systems
Cooling Water
Effluent Treatment
Utilities
Construction
Maintenance
Inspection
Analytical Procedures
Materials of Construction
Corrosion
Properties
Vendor Data
DKL Engineering, Inc.
Handbook of Sulphuric Acid Manufacturing
Order
Form
Preface
Contents
Feedback
Sulphuric Acid
Decolourization
Order Form
Preface
Table of Contents
Process Engineering Data Sheets - PEDS
Order
Form
Table of Contents
Introduction
Bibliography of Sulphuric Acid Technology
Order Form
Preface
Contents
Acid Plant Database November 11, 2020
Owner | National Iranian Copper Industries Company - NICICo | |
Location |
Sarcheshmeh Iran |
|
Background | - | |
Website | www.nicico.com | |
Plant | Plant No. 1 | Plant No. 2 |
Coordinates | 29° 58' 59" N, 55° 51' 12" E | 29° 58' 57" N, 55° 51' 5" E |
Type of Plant | Metallurgical | Metallurgical |
Gas Source | Copper | Copper |
Plant Capacity | 100,000 t/a | - |
SA/DA | SA | DA |
Status | Operating | Operating |
Year Built | 2008 | - |
Technology | FENCO | Outotec |
Contractor | - | - |
Remarks | - | - |
Pictures | ||
General |
In 1972 (1351H.), Sarcheshmeh Copper Mines Joint
Stock Co of Kerman was established; and, later, in 1976
(1355H.), it was renamed as National Iranian Copper Industries Co to involve
all copper mines operations throughout the country. This company has
numerous responsibilities to do including extraction and utilization of
copper mines, production of copper concentrates and manufacturing copper
products such as cathodes, slabs, billets and 8mm wire rods. |
|
References | - | |
News |
February 13, 2018 - An official
with the Department of Environment has called on Sarcheshmeh Copper Complex
to cut production until it addresses its emission issues. “This
factory’s environmental pollution is 23 times the permitted level,” Reza
Jazinizadeh, the head of Kerman Province’s DOE, told ILNA. “We’re
calling on the factory to reduce production during inversion until it sets
up its acid plant.” The official noted that Sarcheshmeh recently set
up its flash furnace but is dragging its feet in establishing an integrated
acid plant to rein in sulfur dioxide emission. The factory’s emissions
are becoming more evident these days due to a weather phenomenon known as
temperature inversion: a condition wherein cold air underpins warm air at
higher altitude, leading to the entrapment of air pollutants, which causes
smog. Sarcheshmeh Copper Mine, located in Kerman Province, is the
world’s second largest and the Middle East’s largest open-pit copper mine.
The mine has over 826 million tons of proven and 1.2 billion tons of
estimated copper reserves with 0.7% average purity (5% of the world’s
total), alongside substantial amounts of other minerals such as molybdenum,
gold and rare metals. National Iranian Copper Industries Company
operates the mine alongside concentration and molybdenum plants, smelters,
refineries and wire rod, slab and billet casting plants. NICICO’s
other mines across Iran include Sungun in northwestern Iran, Taft, Miduk,
Chahmesi and Chahfirouzeh in central Iran, Daralou in the south and
Chehelkoureh in southeast. February 4, 2018 - Thirteen expansion projects of Kerman Province’s National Iranian Copper Industries Company were inaugurated late Thursday by President Hassan Rouhani and Minister of Industries, Mining and Trade Mohammad Shariatmadari. The total value of the projects exceeded 35 trillion rials ($760.8 million), the Iranian Mines and Mining Industries Development and Renovation Organization announced. NICICO is the leading copper producer in the Middle East and North Africa region, as the mines it operates hold close to 14% share of Asia’s copper deposits and about 3% of global reserves. Iran holds about 4 billion tons of estimated copper reserves, according to Geological Survey of Iran. The new production projects include a flash smelter with a capacity of 282,000 tons of copper anode per year alongside the purchase of casting wheels and anode furnaces with an investment of 2.4 trillion rials ($51.6 million) in addition to €182 million; Khatunabad Copper Smelter with an annual capacity of 200,000 tons of copper cathode and an investment of 640 billion rials ($13.7 million) in addition to €143 million; Sarcheshmeh copper plant’s new convertor furnaces’ gas discharge system with 1.54 trillion rials ($33 million) in addition to the investment of €19 million; Sarcheshmeh cathode washing system with 1 trillion rials ($21 million) of investment; Sarcheshmeh’s explosive material production plant with a capacity of 12,000 tons of gelatin dynamites per year with 120 billion rials ($2.5 million) of investment; and expansion of Sarcheshmeh’s sulfuric acid plant capacity to 300,000 tons per year with 580 billion rials of investment in addition to €3 million. The new infrastructure projects comprised the second line of the 80-kilometer Sarcheshmeh-Shahr-e-Babak Road with an 800-billion-rial ($17 million) investment; the first and second phase of Sirjan’s 500-megawatt combined cycle power plant with an investment of 700 billion rials ($15 million) in addition to €285 million; Khatunabad’s new copper concentrate storage with a 60,000-ton capacity and a molybdenum dewatering, drying and drum-filling plant, with a combined investment of 790 billion rials ($17 million); increasing the capacity of quicklime storage by 1,250 tons with an investment of 110 billion rials ($2.3 million); Meymand-Shahr-e-Babak electricity substation with 50 billion rials ($1 million), in addition to an investment of €15 million; and nine electricity substations to feed flash smelters, acid sulfuric and molybdenum plants with 480 billion rials ($10 million) of investment, according to NIOC's website. The company, however, stopped short of saying whether the projects' "inauguration" meant that they have become operational or simply that work has just begun on them. NICICO operates the world’s second largest and the Middle East’s largest open-pit copper mine, Sarcheshmeh. The mine is home to over 826 million tons of proven and 1.2 billion tons of estimated copper reserves, alongside substantial amounts of minerals such as molybdenum, gold and rare metals. NICICO's other mines include Sungun Copper Mine in northwestern Iran, Taft, Miduk, Chahmesi and Chahfiroozeh mines in central Iran, Daraloo Mine in the south and Chehelkoureh Mine in southeast. Stability in Global Prices Capacity expansions at NICICO have come at a good time, as global copper prices are holding their own in 2018. After a series of plunges in late 2017, copper spent most of December growing rapidly to distance itself from its $6,500 lows and jump above $7,000 in January 2018. Prices have taken a beating since the year began, dropping from a high of $7,202 to just above $6,900, but February showings have been strong and it’s now again above $7,100, London Metal Exchange reported. NICICO’s experience with the historic lows of 2015 has made it more resilient and also adaptive. According to the head of IMIDRO, Mehdi Karbasian, NICICO has reduced its copper concentrate finished price from 35,510 rials (76 cents) per kilogram to 24,400 (52 cents) and cathode prices from 51,980 rials ($1.1) to 39,000 rials (83 cents) in the past four years. The cost-cutting enabled the company to survive the low prices and now with the markets improving, it is poised to increase NICICO’s competitiveness. NICICO’s shares are currently being traded at 2,633 rials each on Tehran Stock Exchange with a market capitalization of $3.47 billion. The company is a semi-privatized entity, as a large number of state-owned firms or other semi-privatized companies own its shares. Its largest shareholder, for instance, is the vast mining governmental holding IMIDRO with a 12% share. Bank Mellat, Metal and Mines Development Investment Company are the two other, each owning about 5.7%. May 10, 2011 - Outotec has agreed with Tech Talk company of Dubai on the delivery of flash smelting technology for the expansion of National Iranian Copper Industries Company's copper smelter located in Sarcheshmeh, Iran. Outotec's scope of delivery includes the supervision of detail engineering, supply of proprietary equipment as well as installation supervision and training services. The contract value is approximately EUR 61 million. Before getting this contract effective Outotec has ensured with the relevant export control authorities that the envisaged delivery does not collide with existing embargo regulations. Outotec has applied for and received all the necessary permits. In anticipation of possible subsequent changes in the regulatory framework, the order will be booked in Outotec's order backlog gradually according to the overall progress of the project during years 2011 - 2013. "The Iranian copper smelters require new technology to minimize their environmental impact. Outotec® Flash Smelting technology is recognized as the world's most efficient and environmentally sustainable alternative. The technology is already in use in Iran and therefore the customer preferred it as the first choice", says Outotec CEO Pertti Korhonen. |
MTPD - Metric Tonne per Day
STPD - Short Ton per Day
MTPA - Metric Tonne per Annum STPA - Short Ton per
Annum
SA - Single Absorption
DA - Double Absorption
* Coordinates can be used to