Knowledge for the
Sulphuric Acid Industry 

Sulphuric Acid on the Web
		
		Introduction
General
Equipment Suppliers
Contractor
Instrumentation
Industry News
Maintenance
Acid
Traders
Organizations
Fabricators
Conferences
		Used
Plants
		Intellectual
Propoerty
		Acid
Plant Database
		Market
Information
		Library
Technical Manual
Introduction
General
Definitions
Instrumentation
Plant Safety
Metallurgial
Processes
Metallurgical
Sulphur Burning
Acid Regeneration
Lead Chamber
Technology
Gas Cleaning
Contact
Strong Acid
Acid Storage
Loading/Unloading
Transportation
Sulphur
Systems
Liquid SO2
Boiler Feed Water
Steam Systems
Cooling Water
Effluent Treatment
Utilities
Construction
Maintenance
Inspection
Analytical Procedures
Materials of Construction
Corrosion
Properties
Vendor Data
DKL Engineering, Inc.
		
Handbook of Sulphuric Acid Manufacturing
Order
Form
		Preface
		Contents
Feedback
Sulphuric Acid 
Decolourization
Order Form
Preface
Table of Contents
Process Engineering Data Sheets - PEDS
Order 
Form
Table of Contents
Introduction
Bibliography of Sulphuric Acid Technology
Order Form
Preface
Contents
Sulphur Systems - 
Procedures
- Tank Car Unloading
January 16, 2003
Introduction
This procedure is general in nature and as such should be adapted to the specific conditions and procedures existing at the site at the time the operation is performed.
Safety
Hard hat, safety glasses, safety shoes, long sleeve 
coveralls and gloves.   Supplied air breathing full face mask must be 
worn at all times while on the tank car dome platform.  Safety belt and 
lifeline secured to a fixed point to limit any fall to 1.5 M must be worn at all 
times whilst on the tank car or platform.  Lifeline securing ring on safety 
belt must be positioned in centre of back.  A similar person similarly 
attired and equipped must be in attendance at all times.
Equipment and Supplies
The following equipment will be required:
Procedure
Tank Car Positioning and Preparation
1.             
Make sure the tank car has been "spotted" in the correct position so that all 
connections can be easily made.
2.             
Set tank car handbrake and position wheel chocks.  Position derails to 
north and south of car.
3.             
Attach grounding cable to the frame of the tank car being sure that the opposite 
end is properly attached to ground.
4.             
Lower platform to the tank car dome platform and secure it.
5.             
Whilst on the tank car dome platform, the air breathing full face mask equipment 
must be worn and a second operator, similarly attired must be present on the 
platforms.  Check breathing air cylinders for adequate air supply and open 
valve to supply air to breathing mask connectors.
6.             
As an added precaution, non-sparking tools should be used when working on the 
top of a sulphur tank car.
7.             
At ground level attach fittings and steam and condensate flexible hoses to the 
tank car heating coil.   Open steam supply to the car slowly and check 
that the trap assembly is working correctly and discharging condensate to sewer.  
The trap assembly should be checked regularly to see it is functioning properly.
8.             
The tank car should be inspected regularly - taking all necessary precautions as 
listed above - to determine the nature of the sulphur.  This inspection can 
be carried out by inserting a dip rod into the dome to determine the status of 
the contents. (N.B. Check steam supply pressure).
Tank Car Unloading
Tank 
cars will be bottom unloaded with air assist.
1.             
Two operators fully equipped as described above are required.
2.             
Connect the flexible steam jacketted sulphur line to the outlet on the tank car 
using the adapter.   Make sure that no solidified sulphur is blocking 
the outlet of the globe valve on the car - if so, clear with hot stick, etc.
3.             
Check the air inlet on tank car to make sure it is not plugged with sulphur.  
If it is, use a live steam lance or hot stick to clear it.  If this is 
done, then the dome must be cracked so the steam is relieved into the car and 
the operators will be able to see when line is clear.  During this period, 
extreme caution should be taken because the danger of a sulphur or live steam 
burn is possible.
4.             
Check air line is clear and if so, attach the air valving assembly and air 
supply hose to the tank car air nozzle.  Insert gasket on dome cover and 
secure making sure no sulphur has dropped on the gasket.  This would give a 
poor seal.
5.             
Before unloading begins, make sure the tank or pit is ready to receive sulphur.  
Verify that the tank or pit level gauge and steam heaters working properly.  
Check that steam is on the steam jacketted line and steam traps are functioning 
properly.  The steam should have been on the jackets for several hours 
prior to the offloading beginning to bring all the metal up to steam 
temperature.  Where possible, test flange jumpers and steam traps by 
"chalking" them with a piece of solid sulphur, if the sulphur melts immediately, 
then that section should be hot enough to receive sulphur.  The vent from 
the tank should be clear - make sure the steam tracing on this vent is operating 
correctly.
6.             
Slowly open the valve supplying 30 psig air to the tank car.  Two 
operators, fully equipped, should be present to check for air leaks at the dome 
cover and air fittings.  If there is a leak of air at the top or sulphur at 
the bottom, shut off the air and depressurize the car and attend to the leaks.  
Restart the air and recheck for leaks.
7. Open the plug valve on the tank car slowly, checking for leaks, and when fully open, open the plug valve on the sulphur line slowly. Sulphur should begin flowing into the tank or pit. The level indicator should soon begin indicating an increasing level in the tank or pit.
8. As the tank car nears empty, there will be a point when all the sulphur has left the car and the line empties of sulphur, when the air reaches the pump tank it will blow through the seal pipe and vent to atmosphere. Shutoff the air supply to the tank car and allow the tank car to fully depressurize.
9. Close the sulphur valves, disconnect the air supply, steam and the sulphur unloading line. Seal the tank car and prepare to bring in the next tank car for unloading.