headerdrawing1.jpg (96365 bytes)

Sulphuric Acid on the WebTM Technical Manual DKL Engineering, Inc.

Knowledge for the Sulphuric Acid Industry Line.jpg (1139 bytes)

Sulphuric Acid on the Web

Introduction
General
Equipment Suppliers
Contractor

Instrumentation
Industry News
Maintenance
Acid Traders
Organizations
Fabricators
Conferences

Used Plants
Intellectual Propoerty
Acid Plant Database
Market Information
Library

Technical Manual

Introduction
General

Definitions
Instrumentation
Plant Safety
Metallurgial Processes
Metallurgical
Sulphur Burning
Acid Regeneration
Lead Chamber
Technology
Gas Cleaning
Contact
Strong Acid
Acid Storage
Loading/Unloading

Transportation
Sulphur Systems
Liquid SO2
Boiler Feed Water
Steam Systems

Cooling Water
Effluent Treatment
Utilities
Construction
Maintenance
Inspection
Analytical Procedures
Materials of Construction
Corrosion
Properties
Vendor Data

DKL Engineering, Inc.

Handbook of Sulphuric Acid Manufacturing
Order Form
Preface
Contents
Feedback

Sulphuric Acid Decolourization
Order Form
Preface
Table of Contents

Process Engineering Data Sheets - PEDS
Order Form
Table of Contents

Introduction

Bibliography of Sulphuric Acid Technology
Order Form

Preface
Contents

Sulphuric Acid Plant Specifications
 

Google Search new2.gif (111 bytes)

 

 


Materials of Construction - Acid Resistant Linings - Lining Installation
May 9, 2003

Introduction
Installation Contractor
Material
Material Storage
Installation
Final Inspection
Associated Links

Installation Specification
Installation Details

 


Introduction

The success of an acid resistant lining in a tower or pump tank is dependent on the following factors:

The first three items are the responsibility of the designer while the remaining items are the responsibility of the installation contractor.

Installation Contractor

Employing the services of a contractor experience in the installation of acid resistant lining is essential.  A contractor who lays bricks for residential construction does not have the skills and knowledge to install an acid resistant lining. 

The supplier of the acid resistant lining material will often provide a supervisor to oversee the installation of the lining.   A contractor experienced in this type will be hired locally to provide the labour.   All work will generally be done under the supervision of the supplier who will inspect the work daily to ensure that the lining is being installed as per the design.

The installation contractor should provide at least a one year warranty against defects in workmanship.

Back to top

Material

The quality of the material is one of the keys to ensuring that the lining performs as required.

At the design stage the material being offered by the bidders should be checked to ensure it complies with the specification.   Bidders may offer material of lower quality in order to present the lowest price.   Manufacturer’s specifications and literature for all materials should be reviewed.

At the job site, the materials should be checked to ensure that the materials received are those specified in the purchase order.   This will ensure that lower quality materials have not been substituted.  If there is any doubt about the quality of the materials, samples should be taken and tested.  

A thorough inspection of the material and packaging should be performed.  If the packaging has been damaged checks should be made to ensure that the material has not been affected by dirt or moisture.  If dirt is found on the brick pallets, the bricks should be examined to ensure they are clean.   If significant amounts of dirt are found, a program should be set up by the installation contractor to clean the bricks.

Back to top

Material Storage

The handling and storage procedures specified by the manufacturer should be followed exactly to avoid damage to the material.   The following requirements for storage and handling are generally specified:

Back to top

Installation

An inspector should monitor the work to ensure that the correct materials and procedures are used.  The following are some of the things that the inspector must check:

Back to top

Final Inspection

Final inspection of the installation is primarily by visual means.  The following should be check during the final inspection prior to acceptance of the work. 

The installation should not be accepted unless the installation fully meets the design and specification requirements.  All defects should be repaired to the satisfaction of the inspector and owner.